Customization: | Available |
---|---|
After-sales Service: | Over Sea Installation Available |
Warranty: | 18 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. When the cement tank is working, it must be erected by a special crane and then placed on the prefabricated concrete foundation.
And check the verticality of the cement tank to the horizontal plane after it is erected, and then weld the bottom to the foundation embedded parts firmly.
2. After the storage silo is fixed, the bulk cement truck transports the cement to the construction site, and then connects the bulk cement truck's delivery pipeline with the water
The feed pipelines of the mud tanks are connected, and the cement in the tank is transported to the cement tank through the gas pressure of the bulk cement truck.
3. During the process of transporting cement into the storage silo, the operator must continuously press the button of the vibration motor of the dust collector to shake the
Remove the cement attached to the dust collector bag to prevent the bag from being blocked and causing a warehouse explosion. When the material needs to be discharged, open the bottom of the cone
Manual unloading valve, and then the cement is transported out through the cement delivery device. During the discharging process, if "arching" occurs, press the button of the solenoid valve of the arch breaking device in time to blow air to eliminate "arching" and feed the material to ensure smooth cement supply.
4. Once the bag is blocked and the pressure in the warehouse exceeds the safety pressure of the pressure safety valve on the top of the warehouse, the pressure safety valve can open the release warehouse.
Internal pressure to prevent warehouse explosion accidents. The warehouse fullness and lack of material can be observed through the high and low material levels. When the cement delivery device appeared
In case of failure, close the manual discharge valve at the bottom of the cone to prevent cement from overflowing and causing waste.
Q: what is the material for this machine ?
A: crushed stone, sand, cement, dust and coal fly ash, cinder, slag, gangue, gravel, perlite, and other industrial wastes
Q: How many kinds of block can be made by this machine ?
A: this machine is able to make all types of hollow blocks, solid bricks, paving blocks, curbstone, hemp blocks, ceiling blocks, habiterra block etc. just need to exchange molds
Q: What is the hydraulic oil for this machine ?
A: Summber use 46#, winter use 32#. all easily found locally
Q: Will you provide spare parts for this machine ?
A: we will provide you one year free spare parts.can support machine working for many years
Q:Will you provide installation support?
A: we will provide installation video and manual book.online video avaiable also.
Q:How many days to receive the machine after place order?
A: 20-30days, depends on molds quantity.
Q: How about payment terms?
A: 30% down payment,. 70% balance before loading
Q: How about warranty?
A: 18months.
Q: How about installation?
A: We provide manual, guidance video and video call, if needed, we can also dispatch our engineer to your site to install, commission and train workers